Estimate staggered policy rollout effects
Estimate cohort-aware dynamic effects of a team-by-team policy rollout against not-yet-treated controls, with a simultaneous pretrend identification gate.
What it's for
Turns real phased rollouts of review rules, AI tools, team topology, or reliability practices into defensible effect curves instead of before/after anecdotes.
What you give it
Every tool is a pure function: it computes from what you pass it and reads nothing on its own. Inputs split into evidence you supply from your connected systems, calibration your team owns, and numerical controls that affect precision but never the result's meaning.
| Field | Type | Role | Required |
|---|---|---|---|
| bootstrap_draws | integer ≥ 200, ≤ 20000 | Numerical control | Optional |
| confidence_level | number ≥ 0.8, ≤ 0.999 | Your calibration | Optional |
| equivalence_margin | number > 0 | Your calibration | Optional |
| max_detail_rows | integer ≥ 1, ≤ 500 | Numerical control | Optional |
| minimum_cohort_units | integer ≥ 2, ≤ 10000 | Your calibration | Optional |
| minimum_control_units | integer ≥ 2, ≤ 100000 | Your calibration | Optional |
| minimum_practical_effect | number ≥ 0 | Your calibration | Optional |
| observations | array of objects (5 fields) ≥ 240 items | Evidence | Yes |
| post_periods | integer ≥ 1, ≤ 50 | Your calibration | Optional |
| pre_periods | integer ≥ 2, ≤ 20 | Your calibration | Optional |
| seed | integer | Numerical control | Optional |
Each observations
record
| Field | Type | Required |
|---|---|---|
| adoption_period | integer,null | Yes |
| id | string (non-empty) | Yes |
| outcome | number | Yes |
| period | integer | Yes |
| unit_id | string (non-empty) | Yes |
{
"bootstrap_draws": 200,
"equivalence_margin": 0.2,
"minimum_practical_effect": 0.5,
"observations": [
{
"adoption_period": 5,
"id": "rollout-example-0-0",
"outcome": 0,
"period": 0,
"unit_id": "team-0"
},
{
"adoption_period": 5,
"id": "rollout-example-0-1",
"outcome": 0.2,
"period": 1,
"unit_id": "team-0"
},
{
"adoption_period": 5,
"id": "rollout-example-0-2",
"outcome": 0.4,
"period": 2,
"unit_id": "team-0"
},
{
"adoption_period": 5,
"id": "rollout-example-0-3",
"outcome": 0.6000000000000001,
"period": 3,
"unit_id": "team-0"
},
{
"adoption_period": 5,
"id": "rollout-example-0-4",
"outcome": 0.8,
"period": 4,
"unit_id": "team-0"
},
{
"adoption_period": 5,
"id": "rollout-example-0-5",
"outcome": 2.5, Truncated for display — the full payload is 3368 lines.
What you get back
This is the actual output of running the example above — computed by the same function the platform calls, not an illustration.
{
"assumptions": [
"Treatment adoption is absorbing and the event-study compares each cohort with units not yet treated at the corresponding calendar time.",
"No anticipation, consistency, limited interference, common outcome measurement, and cohort-specific parallel trends are required for a causal interpretation.",
"The overall effect is a treated-observation-weighted average across supported post-adoption event times, not an individual employee score.",
"A causal rollout claim is withheld unless simultaneous pre-treatment intervals fit inside the governed equivalence margin."
],
"decision": "rollout_effect_robustly_positive",
"detail": {
"returned_rows": 10,
"total_rows": 10,
"truncated": false
},
"event_study": [
{
"effect": 0,
"eligible_cohorts": 2,
"event_time": -4,
"interval": {
"high": 0,
"low": 0
},
"minimum_control_units": 20,
"treated_units": 20
},
{
"effect": 0,
"eligible_cohorts": 2,
"event_time": -3,
"interval": {
"high": 0,
"low": 0
},
"minimum_control_units": 20,
"treated_units": 20
},
{
"effect": 0,
"eligible_cohorts": 2,
"event_time": -2,
"interval": {
"high": 0,
"low": 0
}, Truncated for display — the full payload is 189 lines.
How it works
Causal inference & experiment design — Separate what a change caused from what merely moved alongside it.
- 1 Estimate cohort-aware dynamic effects of a team-by-team policy rollout against not-yet-treated controls, with a simultaneous pretrend identification gate.
- 2 Evaluate the method-specific diagnostics and gates returned by the function, then abstain unless the declared decision clears them under locally governed thresholds.
Before you trust it
Every tool in the catalog ships with the conditions under which its answer is meaningful — and the conditions under which it should abstain instead of guessing.
Assumptions & guardrails
- Assignment or adoption timing, interference policy, overlap, attrition, and outcome availability match the estimand encoded by the method.
- A causal label is warranted only when design and diagnostic requirements pass; otherwise treat the result as descriptive or abstain.
Minimum evidence
- observations: at least 240 rows/items
How to validate it
Preserve the assignment/adoption design and validate overlap, pre-period or placebo diagnostics, attrition, interference policy, and cluster-level uncertainty; never tune on the estimated effect.
Calibrating it to your org
Same for everyone
The mathematical kernel, validation rules, method version, and JSON output semantics are organization-independent; no tenant-trained coefficients or company benchmark is embedded in the function.
Specific to you
- balanced consecutive team-period outcome panel
- first deployment period per team for one immutable policy definition
- not-yet-treated risk sets at each cohort/event time
- policy and outcome definition
- analysis epoch, causal exclusion rules, and equivalence margin
- minimum practical effect and cohort/control support
Calibration workflow
- 1 Define the management decision, target outcome, aggregate unit, privacy boundary, cadence, and prediction/intervention horizon for this organization.
- 2 Build a tenant-scoped historical cohort using only information available before each prediction or decision; preserve zero periods, censoring, assignment probabilities, and unresolved outcomes when the method requires them.
- 3 Estimate statistical parameters on training history, but obtain costs, utilities, risk tolerance, practical-effect thresholds, capacity, and policy constraints from accountable decision owners.
- 4 Validate on later time windows or held-out aggregate units at the deployment grain, against a simple baseline and the function-specific validation strategy.
- 5 Deploy only if the returned decision clears evidence, overlap, calibration, robustness, and guardrail checks; warning, unsupported, schema-gap, and fallback decisions are abstentions.
- 6 Monitor realized outcomes, data drift, coverage, and decision regret; recalibrate at a governed cadence or after a detected regime/definition change, never merely because a stakeholder dislikes the result.
Call it from your AI
You don't wire up 388 tools in your MCP client. The GitRevio MCP server exposes 20 tools, three of which let an agent search the catalog, read a tool's schema, and run it — so the assistant finds this one on its own.
gitrevio_capabilities_search
{ "q": "estimate cohortaware dynamic effects of a" }
→ finds "estimate_staggered_policy_rollout_effects"
gitrevio_capability_describe
{ "capability_id": "estimate_staggered_policy_rollout_effects" }
→ returns the input schema and agent guidance shown on this page
gitrevio_capability_run
{ "capability_id": "estimate_staggered_policy_rollout_effects", "arguments": { ... } }
→ returns the result shown above Works in Claude Desktop, Claude Code, Cursor, Cline, Continue.dev, Goose and Aider. See the MCP server.